FOSHAN, CHINA / HOSPITALITY FURNITURE SOURCE
Hospitality furniture source

Furniture selected for the way hospitality works.

A clearer starting point for hotel, restaurant and banquet buyers: browse the range, identify the right category, then send the details that matter.

Hotel ballroom laid out with matched seating for a gala dinnerBISM / PRODUCT SOURCE 01
Dining / lounge / banquetFoshan, Guangdong
Product-ledBrowse by material, or by the space it furnishes.
Commercial-readyDetails organized for wholesale conversations.
OEM / ODMShare a reference and start a discussion.
One clear next stepSend an inquiry with the information you have.
01 / The factory in numbers

Working from Foshan since 2011.

A single workshop in Longjiang, Shunde — cutting, welding, finishing and upholstery under one roof.

About BISM Furniture →
2011FoundedFoshan, Guangdong
5,000m²Factory areaWorkshop and warehouse
50+TeamProduction, QC and sales
50,000chairsMonthly capacitySeating and table frames
02 / Browse the range

Four material groups.

Steel and iron, aluminium, solid wood, and the tables and service items that finish a room. Every model is listed on its group page with the code and the finish.

Browse by space →
05 / Core advantages

What the factory controls.

The parts of a contract order that decide whether a project ships on time — kept in house rather than passed down a chain of suppliers.

One factory, full processCutting, welding, polishing, finishing and upholstery are done in house, so a change of fabric or colour does not wait on an outside supplier.
Built for contract useFrames are welded on jigs and finished for daily commercial use — the parts that fail first in a hotel or restaurant are the parts we over-build.
Photographed on whiteEach model is shot on a plain background, so the buyer sees the frame, the stitching and the finish — not a rendering.
OEM and ODMBring a reference, a drawing or a sample. We work from what you already have instead of asking you to start from a blank brief.
06 / Plant & equipment

What the factory runs.

5,000 m² of workshop, 50+ people and one coating line — so a change of finish or fabric stays inside our own schedule.

11 process steps

Frame making

Tube cuttingAutomatic cutting of steel and aluminium tube to length.
Bending and formingTube bending, shaping and frame forming for curved backs and legs.
Jig-based weldingWelding on fixtures, so frames repeat from one unit to the next.
Drilling and punchingDrilling and punching for joints, hardware and KD packing.

Finishing

Grinding and polishingWeld seams dressed before finishing, so the frame reads as one piece.
Pre-treatment and cleaningDegreasing and cleaning ahead of the coating line.
Powder coatingPowder coating in standard and custom colours.
ElectroplatingGold and champagne finishes for aluminium frames.

Upholstery and assembly

Foam cuttingSeat foam cut in house to the density each model needs.
Cutting and sewingFabric cutting and sewing for seats and backs.
Assembly and QCFinal assembly, inspection and packing before shipment.
07 / How an order runs

Six steps from brief to shipment.

6 steps
01

Send the brief

Reference image, drawing, model code or a description of the venue and the quantity.

02

Quotation

Price, MOQ, loading quantity and lead time for the models in question.

03

Sample

Sample made in the confirmed finish and fabric before the bulk order.

04

Production

Bulk production with in-process checks; progress reported against the agreed date.

05

Inspection and packing

Pre-shipment check, packing to the agreed carton and marking.

06

Shipment

Booking, loading and documents against the agreed trade term.

08 / Compliance

Testing and certification.

Where a market needs documented testing, we confirm the standard and the certificate that applies to the model before the order is placed.

ISO 9001Quality management systemTo be confirmed
BIFMA / EN 16139Contract seating strength testingTo be confirmed
Fabric fire ratingBS 5852 / CAL TB 117 optionsTo be confirmed
Commercial terms

The numbers a buyer asks for first.

Indicative terms for a contract order. Every project is quoted on the model, the finish and the quantity.

Ask for a quotation →
MOQPer model and finish. Trial and sample orders can be discussed.
50 pcs
Sample lead timeSample lead time after finish and fabric are confirmed.
10 days
Production lead timeAfter deposit and confirmation of finish, fabric and packing.
25–30 days
PaymentBalance before shipment. Other terms can be discussed.
30% T/T deposit
WarrantyAgainst manufacturing defects under normal commercial use.
5 years frame / 1 year upholstery
Loading quantityLoading quantity per 40HQ is quoted with the model list.
By model
Next step / Supplier profile

Make the first message useful.

Tell us the category, quantity, market or reference image you already have. The more concrete the brief, the more useful the next reply can be.

01Browse the range
02Share the use case
03Confirm requirements
04Move to quotation
滚动至顶部
atta4d atta4d afterwin88 afterwin88 afterwin88 betwing88 betwing88 colowin colowin deltabet88 deltabet88 deltabet88 epicwin88 fastwin77 fastwin77 firstplay88 fortuneslot88 glory303 glory303 grabwin grabwin grabwin holywin88 ibc88 igcplay igcplay indodepo88 indodepo88 lampuwin lido88 lido88 loyalbet88 loyalbet88 mutubet88 nicewin88 olenation888 palace303 palace303 playking88 poi88 popularwin prima77 prima77 prima77 prima77 ringbet88 ringbet88 ringbet88 ringbet88 sensaslot88 superwin303 togaplay togaplay viralwede wagtoto wagtoto wagtoto wagtoto winlive4d winlive4d winlive4d winlive4d winlive4d winlive4d winlive4d winlive4d winlive4d winlive4d winlive4d winlive4d counterwin88 surgawin surgawin surgawin surgawin surgawin surgawin